Name: Well Grow Industrial Estate
Establishment : 1989
Director: Mrs.Laddawan On-Kampang
Phone: +66 3857 0001, +66 3857 0522-3
Fax: +66 3857 0002
E-mail : wgivte@mweb.com
Developer : Well Grow Industries Company Limited
Industrial Estate Office
78 Moo 1, Bangna-Trad Road Km. 36, Bang Pakong, Chachoengsao 24180
3,508 rai (approx. 1,386 acres)
- General Industrial Zone: 2,659 rai (approx. 1,051 acres)
- Residential/Commercial Zone: 6 rai (approx. 2 acres)
- Area for Public Utilities & Facilities: 822 rai (approx. 324 acres)
ผังแสดงการใช้พื้นที่
- Available Space Diagram
- Residential/Commercial Zone: 6 rai (approx. 2 acres)
Remarks :
1) Area available for sale/lease may vary, due to zoning changes or land transfers.
2) Area available for sale/lease is marketing data.
Land Sale Price
- General Industrial Zone: 4 million Baht/rai
- Bangkok (Khlong Toei) Port: 50 kilometers
- Laem Chabang Deep Sea Port: 55 kilometers
- Don Mueang Airport: 65 kilometers
- Suvarnabhumi International Airport: 20 kilometers
Water Supply System
- Production capacity: 30,000 cubic meters/ day
Electricity Supply System
- Distribution capacity: 200 MVA
- Power voltage: 22 kV, 400/230 V, and 115 kV
Telephone System
- Provider: TT&T Public Company Limited
- More than 3,500 direct telephone lines
Wastewater Treatment System
- Systems: Activated Lagoon with a capacity of 7,200 cubic meters/day; and Sequencing Batch Reactor (SBR) with a capacity of 8,400 cubic meters/day
Incinerator System
- Two incinerators
- Capacity: 29 tons/day
- Average amount of solid waste: 5,726 kilograms/day
Road System
- Primary road: reinforced concrete, 14 meters wide with four-lane divided traffic
- Secondary road: reinforced concrete, 12 meters wide with two-lane divided traffic
Fire Protection System
- One fire engine
- One fire water tender
Security System
- 24 security guards on duty 24 hours a day
Flood Protection System
- Open U-ditch drainage system, measuring 1-2.7 meters wide
Maintenance Fee
- 700 Baht/rai/month
Wastewater Treatment Fee
- 2 Baht/cubic meter
Waste Disposal Fee
- 1-3 Baht/kilogram
Water Tariff
- 16 Baht/cubic meter
Electricity Fee
- Charged according to the rate specified by the relevant authority
Telephone Fee
- Charged according to the rate specified by the authorized service provider